Preferred by the “ P r o s ”E.L. Mustee & Sons, Inc.5431 West 164th St. Brook Park, OH 44142Phone: 216.267.3100 Fax: 216.267.9997 Email: info@mu
10Fig. J Cuadro J*1 Estructura de 1 x 3*2 Panel lateral*3 Tornillos para plataformas – Para una correcta nivelación de los orificios preperforados,
Visit: www.mustee.com11CARE & CLEANING CUIDADO Y LIMPIEZA SOIN ET NETTOYAGEThe surface of your DURAWALL® and DURABASE® shower may be cleaned with
SI-213 (03-09)Patented and patents pending. Made and Printed in U.S.A. Patentes y patentado pendientes. Hecho e impreso en U.S.A. Breveté et brevets e
2748-34ONLY FITS DURABASE® SHOWER FLOORS AS FOLLOWS:EXCLUSIVAMENTE PARA PISOS PARA DUCHA DURABASE® INSTALADOS SEGÚN EL SIGUIENTE PROCEDIMIENTO:CONVIE
Visit: www.mustee.com3CL–DRAIN21/2"21/2"121/2"101/4"5"5"KGEFCBDAJ*1CL–DRAIN31/2"2" x 4"21/2"121/2&qu
4INSTALLATION INSTALACIÓN INSTALLATIONSTEP 1: PASO 1: ÉTAPE 1 :After you have determined where your DURAWALL® and DURABASE® shower is to be located, y
Visit: www.mustee.com5C. Place shower floor directly on sub-floor or slab, and level floor in both directions. Place level along top edge of tile flan
6E. You have been furnished with (6) mounting clips to secure the shower floor. Position (2) two clips per side at stud centers and securely fasten wi
Visit: www.mustee.com7B. The Center and Side Panels have a mounting flange that is designed to accept standard deck screws, the positioning of the stu
8E. If a shower door (enclosure) or curtain rod is to be installed with the unit, we recommend bonding a piece of 1 x 3 furring strip to the backside
Visit: www.mustee.com9Fig. G Cuadro G*1 Cierre*2 Muesca*3 Panel central*4 Panel lateral izquierdoLe schéma G*1 Loquet*2 Fente*3 Panneau central
Commentaires sur ces manuels